By Patrick Binoni & Michael Sisya
What does a maize field have to do with Malawi’s power supply?
Sediment in the Shire can reduce the reservoir storage available for hydropower. Who pays to keep soil on the land when the benefits reach people downstream?

Soil and water
In March 2020, a dredger was commissioned for the Electricity Generation Company (EGENCO) at Kapichira Power Station. EGENCO reported that before dredging, silt occupied about 80% of the reservoir’s active storage, the portion available for normal operation. There was less room to hold water for generation. Soil moving through the catchment had become a problem for the power station’s operating budget.
How soil reaches a reservoir
When rain falls on an exposed slope, runoff can carry soil into a gully or stream. Whether it reaches a dam depends on where it enters the drainage network and what happens along the way. Riverbanks can also erode, and sediment can settle and move again. The route matters when deciding where to spend money on soil and water conservation.
A 2019 study of the Middle Shire catchment linked historical land-cover change and erosion to sediment accumulating at Nkula B, another hydropower station on the river. Agricultural clearing was one of several pressures the researchers identified, alongside settlement expansion and wood harvesting. Identifying how much sediment comes from individual slopes, paths or riverbanks takes evidence closer to those sources.
Who pays for the work upstream?
The Shire BEST environmental trust was set up to sustain restoration in the basin, with early financial support from EGENCO. A 2022 evaluation found that the trust struggled to secure enough funding. An early restoration grant in the Lisungwi–Mwetang’ombe sub-catchment ended six months into the partnership when the trust redirected funds to its own operating costs.
A separate programme, the Malawi Watershed Services Improvement Project, used grants linked to restoration work. In September 2026, the Department of Forestry reported that roughly 2,938 hectares had been placed under natural-regeneration management. It also reported that some farmers were still awaiting their final grants when the project closed. The funded area measures the programme’s reach. The time it takes for a grant to arrive matters to the people who do the work.
Malawi’s National Adaptation Plan, published by the UNFCCC on 20 November 2026, calls for restoring priority degraded catchments. It assigns hydrological monitoring to the National Water Resources Authority and gives the authority and catchment committees a role in catchment planning. If farmers and communities maintain ground cover, stabilise gullies or look after riverbanks, who will cover the cost year after year? A farmer needs to know what work a payment covers and when it will arrive. A downstream operator needs to know where the work could reduce the sediment it has to manage.
What to measure in one tributary
A first study could start with one tributary and one measure that people working there can maintain. Record labour and costs alongside changes in ground cover or the condition of a gully. Measure river flow and suspended sediment during storms and use a baseline or a comparable tributary to help interpret the results. Higher flows can carry more sediment even at a lower sediment concentration.
Downstream, an operator can track dredging costs and interruptions associated with sediment. Upstream, payment dates and the cost of maintenance to households matter too. Both sides need that evidence to decide whether to keep funding the work. Before the rains, the people doing it should know which work will be paid for, how it will be checked and when the money will arrive.
Sources and further reading
- Kapichira dredging project — EGENCO, 2021
- Watershed services for resilient livelihoods — World Bank, 2022
- Land-use change and sediment at Nkula Dam — Earth Observation and Geospatial Analyses, 2019
- Increasing efficiency of hydropower generation in Malawi — Millennium Challenge Corporation, 2022
- Long-term support for the Shire BEST Trust — Millennium Challenge Corporation
- MWASIP restoration and natural regeneration results — Malawi Department of Forestry, 2026
- Malawi’s National Adaptation Plan publication record — UNFCCC, 2026
- Water priorities in Malawi’s National Adaptation Plan — Government of Malawi, 2026
Bring us a question from the field.
Opens your email app. Share your question, location and the decision you need to make. We use an initial conversation to clarify the question, scope and useful next step.